Klang Valley Mass Rapid Transit:
Sungai Buloh – Serdang – Putrajaya Line

Design, Supply, Installation, Testing and Commissioning of Building Management System for
Elevated Platform and Depot

In Progress. Pictures coming soon.

Rawang – Ipoh Double Track (RIDT)

Overhaul and Inspection Maintenance for 25kV Overhead Catenary System (OCS),
Power Supply Equipment and SCADA System

In Progress

KTMB Six-Car-Set Onboard Automatic Train Protection System (ATP)- 9 ETS

Design, Supply, Installation, Testing and Commissioning of 9 train sets of Automatic Train Protection System (ATP) based on European Railway Train Management System (ERTMS) with Specific Transmission Module (STM) and European Train Control System (ETCS) Level 1 on Six-Car-Set

In Progress

Klang Valley Mass Rapid Transit:
Sungai Buloh – Kajang Line

Operation and Maintenance of High Voltage Power Distribution System for MRT Sungai Buloh – Kajang Line

In Progress

Klang Valley Mass Rapid Transit:
Sungai Buloh – Serdang – Putrajaya Line

Engineering, Procurement, Construction, Testing & Commissioning of Signalling & Train Control System and Platform Screen Door

In Progress

Klang Valley Mass Rapid Transit:
Sungai Buloh – Kajang Line

Engineering, Procurement, Construction, Testing & Commissioning of Signalling and Train Control System

Completed July 2017

Maintenance of Onboard Automatic Train Protection System (ATP) for KTMB Six-Car-Set

The Maintenance of Automatic Train Protection System (ATP) for KTMB Thirty-Eight (38) Sets of Six Cars Electric Multiple Unit (SCS)

Completed February 2017

KTMB Six-Car-Set Onboard Automatic Train Protection System (ATP) – 10 ETS

Design, Supply, Installation, Testing and Commissioning of 10 train sets of Automatic Train Protection System (ATP)based on European Railway Train Management System (ERTMS) with Specific Transmission Module (STM)and European Train Control System (ETCS) Level 1 on Six-Car-Set

Completed June 2016

Seremban EMU Depot

Full Turnkey Railway Systems: Design, Supply, Installation, Assembly, Testing and Commissioning,System Integration for Signalling, Communication and Overhead Catenary System (OCS)

Completed June 2014

Kuala Lumpur Sentral Station Signalling System

Design, Supply, Assembly, Installation, Testing and Commissioning for the Remodelling of Signalling System between Simpang Batu and Simpang Pelabuhan Klang to improve the line capacity and headway for the train operation in this sector

Completed May 2015

KTMB Six-Car-Set Onboard Automatic Train Protection System (ATP) – 38 SCS

Design, Supply, Installation, Testing and Commissioning of 42 train sets of Automatic Train Protection System (ATP) based on European Railway Train Management System (ERTMS) with Specific Transmission Module (STM) on Six-Car-Set

Completed February 2013

Seremban – Gemas Electrified Double Track Project

Turnkey package for the Design, Supply, Assembly, Installation, Testing and Commissioning of the Wayside Automatic Train Protection System (ATP)

Completed December 2013

Sentul – Batu Caves Electrified Double Track Project

Design, Supply, Installation, Testing & Commissioning of ATP Wayside System, Supply of Point Machines and 25kV Tie Circuit Breaker which consist of Switchgear, Control Panel and SCADA

Completed April 2010

Construction of Batu Gajah EMU Depot

Design, Supply, Installation, Testing & Commissioning of Overhead Catenary System and Mid Point Track Sectioning Location which consist of 25kV Switchgears, Control & Protection and SCADA

Completed July 2012